Movies Logo
February 7, 2009

Season 23

01. Digging Out the Yard

The Hometime crew re-grades a sloping back yard, installs a drainage system, and begins building a series of paver patios.

30min
February 7, 2009

02. Urban Terraces

The Hometime crew weaves several retaining walls, steps, and patios into a small, sloped back yard.

30min
February 14, 2009

03. Caretaker's Home

The Hometime crew restores the porch of what was once the caretaker’s home on a 40-acre, turn-of-the-century lakeside estate.

30min
February 21, 2009

04. Entrance Plaza

The Hometime crew renovates a church courtyard with a textured concrete walkway, custom wood benches, and a raised planting bed.

30min
March 7, 2009

05. Betsy-Tacy Home: Decoration

The Hometime crew makes its last visit to this historic home to create a sidewalk outside and to finish painting and wallpapering the interior.

30min
April 4, 2009

06. Eat-In-Kitchen: Demolition

The Hometime crew takes a small kitchen and starts work to improve storage and functionality.

30min
April 11, 2009

07. Eat-In-Kitchen: Cabinets

The Hometime crew installs new kitchen cabinets, a new sliding door and new floor tile.

30min
April 18, 2009

08. Eat-In-Kitchen: Wrap Up

The Hometime crew installs countertops and appliances, as well as a new wood floor for the adjacent living room.

30min
April 25, 2009

09. Sculpture Studio: Framing

The Hometime crew converts an unused, tuck-under garage into a metal-working studio with a new heater and a downsized garage door.

30min
May 2, 2009

10. Sculpture Studio: Finishing

The Hometime crew wraps up the workshop with doors, windows and welding equipment.

30min
May 9, 2009

11. Great Room Hardwood Floor

The Hometime crew installs a super-hard, prefinished wood floor.

30min
September 5, 2009

12. Travertine Floor

The Hometime crew installs large-format limestone flooring.

30min
September 12, 2009

13. Seven-Year Plan

The Hometime crew works with a designer to identify and prioritize a house-wide makeover. Then they begin with the first phase: tearing apart the living room and dining room.

30min
September 19, 2009

14. Kitchen Facelift

The Hometime crew transforms a kitchen with re-faced cabinets along with new counters, tile, appliances and lighting.

30min
September 26, 2009

15. Great Room Update

The Hometime crew uses new trim, wood flooring, lighting, paint and furniture to transform a dated, 1970s living room and dining room.

30min
October 3, 2009

16. Linoleum Flooring

The Hometime crew installs sheet and tile linoleum on the Hometime log cabin basement floor.

30min
October 10, 2009

17. Cabin Kitchen Upgrade

The Hometime crew modifies and upgrades cabinets, appliances, countertops and plumbing fixtures.

30min
October 17, 2009

18. Vacation Home Laundry Room

The Hometime crew adds new cabinets and plumbing fixtures to a log cabin lower level.

30min
October 24, 2009

19. Historic Summer Home -- Structural Upgrades

Dean, Miriam and the Hometime crew remove cabinets, asbestos flooring and a concrete slab then ingeniously reinforce sagging walls and pour a new concrete kitchen floor.

30min
October 31, 2009

20. Historic Summer Home -- Kitchen

Dean, Miriam and the Hometime crew rebuild old cabinets and install historically sensitive countertops, flooring, fixtures and appliances remodeling this 100-year-old kitchen.

30min
November 7, 2009

21. Barrel Vault Basement

The Hometime crew transforms a bland, unfinished basement by juggling doors and windows, repairing humps and cracks in the floor, and creating an arched ceiling.

30min
November 14, 2009

22. Party Kitchen

The Hometime crew puts in doors, tile and cabinets for the basement wet bar and peninsula.

30min
November 21, 2009

23. Arched Wood Panels

The Hometime crew puts in granite countertops and a trendy shower door then wrap up the custom wood paneling around a basement fireplace.

30min
November 28, 2009

24. Attic Trusses

The Hometime crew shores up the block walls then uses attic trusses to create a room over a flat-roofed, detached garage.

30min
December 5, 2009

25. Standalone Garage

The Hometime crew seals up the exterior of the garage and the new studio above it.

30min
December 12, 2009

26. Yoga Studio

The upstairs studio gets paint, flooring, and lighting. The downstairs garage gets flooring and cabinets.

30min
December 19, 2009