Movies Logo
February 6, 2010

Season 24

01. Sculpture Studio Extension - Floor

The Hometime crew uses pavers and retaining walls to capture space under a second-story deck.

30min
February 6, 2010

02. Sculpture Studio Extension - Walls

The Hometime crew frames and insulates curtain walls to enclose the space under a second-story deck.

30min
February 13, 2010

03. Sculpture Studio Extension - Wrap Up

The Hometime crew finishes the space under a second-story deck to expand a workshop used to create metal sculpture.

30min
February 20, 2010

04. Stone Cottage – Cul-De-Sac Prep

The Hometime crew works with surveyors, graders and architects to prepare a building site. Episode one of a thirty part series focusing on this well-designed, state-of-the-art home.

30min
February 27, 2010

05. Stone Cottage – Concrete & Foam

The Hometime crew works with a contractor to excavate for the new house and use poured-in-place insulating concrete forms for the basement walls.

30min
March 6, 2010

06. Stone Cottage – Instant House

The Hometime crew helps out as the floors and walls of the house are pre-built in a nearby factory and then quickly assembled at the job site on top of the foundation.

30min
March 13, 2010

07. Stone Cottage – Roofscape

The Hometime crew watches as the intricate roof framing components for the house are pre-built off-site, assembled on the ground, and finally hoisted into place.

30min
March 20, 2010

08. Stone Cottage – Windows

The Hometime crew supervises the design, construction and installation of the windows for the home, and explains the natural slate roofing system.

30min
March 27, 2010

09. Stone Cottage – Concrete Floors

The Hometime crew prepares for and supervises the installation of the basement, garage and porch floors.

30min
April 3, 2010

10. Stone Cottage – Inner Workings

The Hometime crew manages the installation of the ductwork, recessed lighting, and central vacuum while also helping out with the driveway, stonework and siding.

30min
April 10, 2010

11. Stone Cottage – Insulation

The Hometime crew installs cables for lighting control, audio, video and security and helps out with several types of insulation.

30min
April 17, 2010

12. Stone Cottage – Geothermal

The Hometime crew helps out installing the radiant floor heating system and the geothermal heating and cooling equipment.

30min
April 24, 2010

13. His and Her Garage

The Hometime crew wraps up a project with a second floor yoga studio for “her” and a garage-level workshop for "him."

30min
September 11, 2010

14. Stone Cottage -- Interior Walls

After some last-minute preparation crews install four different types of wall board for the interior walls and ceilings.

30min
September 18, 2010

15. Stone Cottage -- Vaulted Ceilings

The project house gets sheathing for the floors, extra-tough primer on the walls, and a stained-cedar vaulted ceiling in three high-profile rooms.

30min
September 25, 2010

16. Stone Cottage -- Millwork

Wooden beams are built outside for the porches. Inside, hardwood trim wainscoting is installed.

30min
October 2, 2010

17. Stone Cottage -- Exterior Doors

The Hometime crews scopes out how the custom matching garage and entry doors are made, and helps out leveling the floors for tiling.

30min
October 9, 2010

18. Stone Cottage -- Tile

The Hometime crew helps out as craftsmen install ceramic and natural stone tile in the bathrooms, natural stone on the fireplace, and natural stone for the retaining walls.

30min
October 16, 2010

19. Stone Cottage -- Driveway

The Hometime crew installs the paver driveway, as well as the master bathroom cabinets.

30min
October 23, 2010

20. Stone Cottage -- Interior Doors

The Hometime crew works on the interior doors, kitchen cabinets, wainscoting, and exterior columns.

30min
October 30, 2010

21. Stone Cottage -- Laundry Room

The Hometime crew installs custom cabinets for the laundry room and starts the home’s wood flooring.

30min
November 6, 2010

22. Stone Cottage -- Office

The home office begins to take shape, as the custom staircase work begins.

30min
November 13, 2010

23. Stone Cottage -- Countertops

The stone countertops are fabricated and installed.

30min
November 20, 2010

24. Stone Cottage -- Fixtures and Appliances

The Hometime crew installs cabinets, countertops and landscaping.

30min
November 27, 2010

25. Stone Cottage -- Retractable Screens

The covered porch gets motorized screens, the garage floor gets an epoxy coating, and the last few cabinets are installed.

30min
January 22, 2011

26. Stone Cottage -- Sod and Stone

The custom handrail is built, granite countertops are installed, the drip irrigation is wrapped up, and the yard gets sod.

30min
January 29, 2011