Movies Logo
May 20, 2025

Season 1

01. All Aboard An Australian Icon

The iconic Ghan needs some bogies changed fast, a routine wheel lathe job hits a snag, plus an 80 year old steam loco climbs a mountain for a special anniversary.

45min
May 20, 2025

02. Getting a Freight Train to the Finish Line

The Spirit of Queensland’s maintenance team race to change a bogie, the construction of a freight locomotive nears completion, and a breakdown crew hustles to get a commuter train back on track.

45min
May 27, 2025

03. High Stakes Engine Rebuild

Skilled technicians battle with a stubborn alternator, a crew tackle a high-stakes engine rebuild for a freight train, plus it takes a team of experts to build a massive locomotive underframe.

45min
June 3, 2025

04. Getting A Cane Loco Back To Harvest

A loco needs a double bogie change to get back to the sugarcane harvest, traction motors from mining trains are getting rebuilds, plus the heat is on for a tricky air conditioner replacement.

45min
June 10, 2025

05. One Day Mission To Replace Freight Engine

A freight train needs an urgent engine replacement after a critical failure, a 132 T loco requires a complex bogie change, plus catch the special forces of rail, the RORU team, in action.

45min
June 17, 2025

06. Single Day Traction Motor Challenge

A commuter train undergoes a tough traction motor replacement, one maintenance team takes on two huge jobs, plus a leaky torque seal sidelines a sugarcane loco urgently needed for the harvest.

45min
June 24, 2025

07. High Precision Gear Box Overhaul

A finicky one tonne gearbox, a tight squeeze into a vintage loco during a boiler service, plus shunting a train across 3 rail crossings at peak hour - just another busy day in railway maintenance

45min
July 1, 2025

08. Rusty Water Tank Cut Off Steam Loco

A rusty 10 tonne water tank gets cut off a vintage steam loco, a challenging 4-car passenger train lift & bogie change, plus Kuranda Scenic Railway carriages get spruced up by the carpentry team.

45min
July 8, 2025

09. Loco Maintenance Team Expect The Unexpected

A busy loco maintenance team that always expect the unexpected, a challenging 8 tonne water tank installation on a vintage loco, plus an electronics team on a mission to stop e-waste in its tracks.

45min
July 15, 2025