04. Vermont Farmhouse: Framing and Wiring for the Future

Framing continues, while in the basement installers put in special wiring to make this farmhouse a "connected home". Also: a tour of NASA's Johnson Space Center in Houston, Texas.

September 24, 2001

05. Vermont Farmhouse: Exterior Update

Metal roofing installation is underway, and the redwood deck is constructed. Included: trimwork on the porch and lessons in farming.

October 1, 2001

07. Vermont Farmhouse: Exterior Painting and Kitchen Cabinet Installation

Painting has begun on the exterior, while custom cabinets are installed in the kitchen. Also: a tour of Crown Point factory in Claremont, NH.

October 15, 2001

08. Vermont Farmhouse: Finish Trim and Cabinet Installation

Trim work is completed in the living room and the fireplace is installed. A window and vanity are added to the master bath.

October 22, 2001

09. Vermont Farmhouse: Stone Wall Construction and Covered Bridges

Exterior work continues with construction of a new stone wall. Inside the farmhouse, a staircase is built. Also: a look at the heritage of covered bridges in VT.

October 29, 2001

10. Vermont Farmhouse: Connected Home Update and Garage Doors

Work continues in the garage, while home automation solutions are explored inside the residence.

November 5, 2001

11. Vermont Farmhouse: Kitchen Update and Bathroom Tile Installation

Bob Vila catches up on progress in the home's kitchen, where new appliances have been installed. In the bathroom, tile is applied.

November 12, 2001

12. Vermont Farmhouse: Home Entertainment and Carpet Installation

Landscape work begins; inside, carpet is laid down and a new entertainment center is installed. Special appearance: model and designer Kathy Ireland.

November 19, 2001

13. Vermont Farmhouse: Project Completion

Bob Vila takes a final tour of the completed farmhouse project, paying special attention to the landscaping, home automation features, and interior design.

November 26, 2001

14. Victorian Restoration: Initial Tour

This ambitious restoration project involves renovating a Victorian home as well as a former dairy barn also on the property.

December 3, 2001

15. Victorian Restoration: Exploring the Barn and Demolition

Bob Vila focuses on the barn, a former dairy storage building that will be converted into an artist's studio and office space.

December 10, 2001

16. Victorian Restoration: Moving the Entrance and Kitchen Layout

The front door is relocated to accommodate a new larger entranceway, while the design for the kitchen is determined. Also: a tour of Isaac Royall House.

December 10, 2001

17. Victorian Restoration: Electrical Systems and Wiring and Upstairs Framing

Rough electrical work is in progress, framing is underway on a new addition, and a new tub and new windows are installed.

December 24, 2001

18. Victorian Restoration: Roof Work and Lighting

The barn's roof system gets a makeover, while the interior gets air conditioning. Shingles are added to the exterior, along with a new gutter system.

December 31, 2001

19. Victorian Restoration: Skylight Installation, Roofing, and Painting

A tubular skylight is installed, along with new triangular peak windows. Also, exterior painting gets underway.

January 7, 2002

20. Victorian Restoration: Barn Insulation, Video Wiring, and a New Balcony

Cellulose insulation is installed, and construction of the second-floor balcony begins.

January 14, 2002

21. Victorian Restoration: Blue Board Installation, Landscaping, and a New Garage Door

The differences between blue board and drywall are discussed, and special fencing is put in. Also: a tour of the factory where the fencing is made.

January 21, 2002

22. Victorian Restoration: Work On the Driveway and Finishing the Deck

Stone pavers are installed in the driveway and deck construction begins. Plaster is applied in the bedrooms, and new barn-style doors are installed in the converted dairy storage building.

January 21, 2002

23. Victorian Restoration: Flooring, Glass-Block Walls and Floors, and Water Filtration

An interlocking laminate floor system being installed, along with a glass-block wall in the master bath and glass-block flooring elsewhere. The water filtration system is also established.

January 28, 2002

24. Victorian Restoration: Landscaping Begins, Flooring Continues, and Water Heater Installed

Landscaping gets underway on the Victorian restoration project house property.

February 4, 2002

25. Victorian Restoration: Cabinets, Countertops, and Closets

Cabinets and countertops are installed in the kitchen. In the master bedroom, a custom closet system is designed.

February 18, 2002

26. Victorian Restoration: Final House Tour

The Victorian house in Medford, MA is complete, and Bob Vila guides a tour of the finished restoration, from the pergolas in the yard to the electronics in the home office.

February 25, 2002