Movies Logo
September 7, 1992

Season 3

01. Victorian: Selecting the Site

Bob Vila's first project of the season is introduced: an addition to a small cottage in Martha's Vineyard, Massachusetts.

September 7, 1992

02. Victorian: Clearing the Lot

Bob meets with the contractor and architect and clears trees for the new addition, while demonstrating chain-saw safety. Also: a tour of a Newport, R.I., mansion.

September 14, 1992

03. Victorian: Foundation and Framing

A cinder-block foundation is laid and the framing begins on a turret of the existing cottage. Also: a tour of Victorian homes in Cape May, N.J., one of America's oldest resort towns.

September 21, 1992

04. Victorian: Raising the Walls

Truss joints are installed in the bedroom wing, and, as the walls are raised, Bob describes the advantages of western balloon framing. Also: a tour of Lyndhurst mansion in the Hudson River valley of New York.

September 28, 1992

05. Victorian: Chimney, and Breezeway Framing Selecting the Site

A chimney is built and the connections between the old and new structures are installed. Also: a visit to a wood-stove factory in Vermont.

October 5, 1992

06. Victorian: Verge Board and Plumbing

A designer specializing in Victorian work adds elements to the exterior, and a verge board is installed on a gable end. Also: a walk through Lucy the Elephant, a tourist exhibit on the New Jersey shore, and a look at how to build PVC wastes and vents.

October 12, 1992

07. Victorian: Porch, Windows and Shingles

Work begins on the front-entry porch. Also: tips on installing windows and applying cedar roof shingles.

October 19, 1992

08. Victorian: Insulation and Wiring

Installing blown-in and high-density insulation; adding railing detail to the porch. Also: tips on basic wiring and installing a septic tank.

October 26, 1992

09. Victorian: Wallpapering and Pantry

Included: installing the kitchen pantry, wallpapering the den, and examining the wallpaper manufacturing process. Also: how Victorian doors are made.

November 2, 1992

10. Victorian: Installing Shingles and Tin Ceiling

Shingling is applied and a stamped-tin ceiling gets installed in the kitchen. Also: selecting color schemes for the house during a tour of Martha's Vineyard.

November 9, 1992

11. Victorian: Courtyard Pavers and Master Bath

Inside a Victorian mansion with an Arabian decorating scheme. Also: adding Victorian touches to the master bath.

November 16, 1992

12. Victorian: Plate Rail and Stenciling

A plate rail is installed in the kitchen, and a designer offers ideas on Victorian interiors. Also: landscapers begin planting in the courtyard.

November 23, 1992

13. Victorian: House Tour

A tour of the completed Victorian house includes a look at the new turret and courtyard, as well as the larger addition.

November 30, 1992

14. Beach House: Selecting the Site

Work begins on a house in Malibu, California. Also: a tour of Los Angeles by helicopter.

December 7, 1992

15. Beach House: House Tour

Bob Vila tours the Malibu, California house, talks with the architects, and observes California-Spanish architecture.

December 14, 1992

17. Beach House: Demolition and Grade Beam Installation

The foundation is inspected and a beam is installed in the garage.

December 28, 1992

18. Beach House: Building the Staircase

California's building codes regarding earthquake safety are discussed and a winding staircase is constructed. Also: a visit to the home of actor Max Gail.

January 4, 1993

19. Beach House: Framing and Insulation

Included: the roof and walls are framed, and cellulose insulation is added.

January 11, 1993

20. Beach House: Installing Windows and Sprinkler System

Installed: a custom-made window and a sprinkler system. Also, Bob Vila takes visits Wisconsin to see how custom windows are made.

January 18, 1993

21. Beach House: Monitoring Network and Waterproofing

The project's environmentally sound features are discussed. Also: Bob Vila takes a trip to the home of actor Tim Allen ("Home Improvement").

January 25, 1993

22. Beach House: Tile Roof and Stucco

Mexican tile is used for the roof. Also: Bob Vila helps comedian Tim Allen pour concrete for a garage floor.

February 1, 1993

23. Beach House: Distressing and Hanging a Door

The front door is hung. Also: adding a distressed finish to wood and building a storage wall.

February 8, 1993

24. Beach House: Tile Layout

Hand-painted tiles are installed in the master bath and on the staircase. Also: a trip to the Mexican workshop where the tiles are made.

February 15, 1993

25. Beach House: Stone Columns and Custom Cabinets

A terracotta tile floor is laid. Also: security cameras, temperature controls and kitchen appliances are installed, and the courtyard is landscaped in California-Spanish villa style.

February 22, 1993