Movies Logo
September 1, 1997

Season 8

01. Craftsman Bungalow: Project Introduction

A vintage Sears kit house is restored, but historic and sentimental elements are preserved.

September 1, 1997

02. Craftsman Bungalow: Wiring, Plumbing and Plastering

A closet is transformed into a bathroom, while new and old building materials are blended in the living and dining rooms.

September 8, 1997

03. Craftsman Bungalow: Reconditioning the Windows

Bob Vila oversees the reconditioning of an original window in the Sears kit house. Also: a tour of Frank Lloyd Wright's Hollyhock House.

September 15, 1997

04. Craftsman Bungalow: Interior Trim and Porch Framing

Interior trim details are custom-milled as per the architect's specifications, and original bathroom fixtures are re-porcelainized. Also: framing continues on the back porch.

September 22, 1997

05. Craftsman Bungalow: Repairing the Front Facade

Vintage cabinetry is discovered in a salvage yard and installed in the kitchen; yellow paint is stripped off; and the facade is given a facelift.

September 29, 1997

06. Craftsman Bungalow: Swimming Pool and Porch

The pool crew finishes the rebar and sprays gunnite, while French doors are installed in the master bedroom and the porch roof is repaired.

October 6, 1997

07. Craftsman Bungalow: Working On the Pool

Green Indian slate is installed on the surround and porch steps. Also: the backyard entry gate is finished.

October 13, 1997

08. Craftsman Bungalow: Exterior Paint Preparation

At the Sears kit house, the exterior is stripped for priming and painting. Also: a tour of the CBS studio center.

October 20, 1997

09. Craftsman Bungalow: Floor Tile and Cabinet Installation

The bathroom is tiled, new kitchen cabinets are custom-made to match the vintage ones, and decking is installed on the back porch.

October 27, 1997

10. Craftsman Bungalow: Installing Custom Light Grids

The electrician installs back lighting in the living room, and six stained-glass panels are cut and assembled. Meanwhile, contractors insulate the roof.

November 3, 1997

11. Craftsman Bungalow: Installing Cabinets

A cabinetmaker frames boxes for living-room built-ins to match existing ones in the kitchen, and the pool crew finishes the plaster.

November 10, 1997

12. Craftsman Bungalow: Hardwood Floor Repair and Refinishing

Damaged hardwood flooring is repaired and an alder kitchen countertop is installed. Also: a tour of the Japanese Garden at Huntington Library and tips on building a Zen garden.

November 17, 1997

13. Craftsman Bungalow: House Tour

Bob Vila leads a final tour of the landscaped front yard and the porch addition, which features a barbecue. Also toured are the Zen garden and swimming pool.

November 24, 1997

14. Dream Garage: Project Introduction

Plans for a post-and-beam garage and boat storage project are discussed with an architect. Also: touring a marina with America's Cup champ Bill Koch.

December 1, 1997

15. Dream Garage: Working On the Foundation

Foundation work is begun, while Bob Vila tours an antique car museum in a Shaker-style round barn in Sandwich, MA.

December 8, 1997

16. Dream Garage: More Foundation Work

As the foundation is prepared, Bob Vila explains termite-proofing and oversees the installation of a hydronic heating system.

December 15, 1997

17. Dream Garage: Framing the Garage

A look at framing, and the special techniques and tools that are used for it. Also: a tour of a lumber company examines pre-cut materials for the post-and-beam plan.

December 22, 1997

18. Dream Garage: Framing and Decking

New decking is installed in the loft, while Bob Vila and the crew put up the ridge beam and rafters. Also: a joinery specialist demonstrates house framing.

December 29, 1997

19. Dream Garage: Insulating the Garage

Insulation panels are installed and Bob Vila visits a factory where all-in-one wall product is made.

January 5, 1998

20. Dream Garage: Exterior Trim and Siding

Windows, exterior trim and siding are installed. Also: a tour of the American Plywood Association lab, where quality testing is observed.

January 12, 1998

21. Dream Garage: Skylights and Metal Roofing

Metal roofing is installed and drywall is put up around the skylights.

January 19, 1998

22. Dream Garage: Installing Protective Features

Bob Vila takes a look at such safety features as motion detectors, a fire-suppression unit and a lightning rod.

January 26, 1998

23. Dream Garage: Installing a Staircase and Paneling

A horticulturalist shares general landscaping tips and offers special advice on the use of native plants and trees. Also: building a staircase to the loft.

February 2, 1998

24. Dream Garage: Heating and Lighting

A garage-door opener is installed, the heated-floor system is activated, and interior paneling is stained. Also: track lighting goes in.

February 9, 1998

25. Dream Garage: Setting up the Workshop and Garage

The interior of the barn is stained and a workshop is assembled. Also: race-car driver Lyn St. James helps Bob Vila set up the automotive garage with new tools.

February 16, 1998

26. Dream Garage: Barn Tour

Workbenches are completed and metal shelves are installed in the loft, before Bob Vila leads a tour of the finished barn.

February 23, 1998